By Marianne Cole
FOCS Exciting news!!!
Friends of the
Corridor Schools (a committee of dedicated young moms along with current
and former teachers as well as community members) has had a very busy
and exciting week. After receiving an urgent email from Wild Rose
School Division last week saying they needed a Letter of Intent, by
Tuesday, April 28, stipulating the desired enhancements to the proposed
new schools at Leslieville and Condor along with the financial support
we’d be able to provide. An online meeting of the group was quickly
organized and everyone sprang into action. By the deadline we excitedly
notified WRSD that we had raised $81, 355 which would then be matched
by Clearwater County for a total of $162, 710!!! These extra dollars are
going to provide for an enlarged gym and CTS lab at the high school at
Leslieville along with kitchen facilities at the elementary school at
Condor.
We send huge thank you’s to all the people,
organizations, and businesses that so generously stepped up to the
plate. The group’s original fund raising activities/plans all came to
an abrupt halt with Covid19 so it is absolutely amazing the results that
were achieved by word of mouth and social media.
There is still a
need, however, for more financial aid and it is hoped the county and
community members might continue to add their support. Information on
this can be obtained from WRSD or by going on the FOCS website.
Clearwater County Tax Rate Information
At their meeting on Tuesday,
April 28, Clearwater County Council passed first reading of a motion
that would see a 0% tax rate increase for 2020. In explanation of the
tax rate bylaw it was noted that there are 4 requisition areas: 1.
Provincial School Tax 2. Municipal Tax Levy 3. Senior’s
Foundation and 4. Designated Industrial Property Assessment (set by
the province).
The province has lowered the school requisition
down to the 2019 rates. The municipal assessment for 2019-2020 has
remained fairly steady so non-residential properties will see a decrease
in their school requisition while residential ratepayers will remain
the same or have a slight increase. Maintaining a 0% municipal tax rate
would satisfy the budgeted tax revenue for this year. The Senior’s
Foundation requisition saw a budgeted increase of $19, 382 so that
results in a 3.2% increase in tax levy for that category.
Second
and third reading of this bylaw will take place on May 12. Earlier,
Council had passed a motion to delay penalty dates for unpaid taxes to
November 6 (from September 16) with an 8% penalty applied then and an
additional 4% on December 16 if still unpaid.
Broadband Projects
Discussion also took place on April 28th on the
current status of improved broadband/internet service projects in the
county. It was noted that Alberta Economic Development has deemed
improved rural broadband service a high priority. While no definitive
provincial support was mentioned, there are various federal grants that
may be applied for when projects are “shovel ready”. This means that
the engineering has been done and tenders are ready. Currently RFP’s
for a fibre backbone to Ferrier have closed and staff will be evaluating
them on April 30th. Another project in the works will provide improved
service to the Condor Public Services Building and the hamlet of
Condor.
Along with the expressed need for better service, Council
also noted the need for public engagement on this matter. In the end,
Council passed motions that direct Administration to develop a public
engagement strategy along with proposed projects, including RFP’s on the
Condor project.
Leslieville Public Services Building
In the April 28th agenda package it was noted in the Public Works
report that “The RFP for the building was advertised April 20th, 2020.
Closing date for proposals is May 12th, 2020. Construction is to
commence July 31st, 2020 and be completed by December 31st, 2020.”
The
proposed size and scope of the building remain a concern with comments
continually being expressed about the definite lack of need for the
Leslieville facility to be as large as the one at Condor. Most
frequently the comments focus on the need for 6,000 sq. ft. of
staff/training space when an equally large area is already available at
Condor. Currently the two groups train/meet together at Condor. It is
also often expressed that there is no need for 5 storage bays and this
was substantiated by administration at Council’s March 24th meeting.
Finally, it has been suggested that the 12 acres initially allotted to a
training area at Leslieville could better be used for commercial
development. A rather forward thinking “millennial” even suggested a
mobile home park on that land would be a great use of space and a
positive addition to Leslieville.
In consideration of the fact
that the RFPs close on May 12 and Council will then make their final
decisions it is crucial that you let your councillors know your opinion:
What are the basic needs for the facility at Leslieville: *** 5 bays
vs 3 bays??? *** 6,000 sq. ft. of staff space vs something much
smaller??? *** Training area in 2 places vs training in the already
available space at Condor???
As mentioned above, please let your
voice be heard by Council. You may also email your comments to
mcmajic@telus.net or give me a call at (403)729-2493 and I will pass
them on. Fiscal responsibility is even more crucial at this time.
Smiles for spring:
What flowers grow on your face? (Tulips)
What did the tree say to spring? (What a re-leaf!!)
Coming Events: Due to Covid19 future CCTA meetings are cancelled.
Friday, May 1, 2020
Monday, April 6, 2020
IN THE NEWS
By Marianne Cole
Leslieville Fire Hall
At the March 24th Council meeting Marianne Cole, on behalf of the CCTA, made a presentation to council. She reinforced the need for fiscal restraint, noting there is no need for another large facility 11 km. away from Condor. As well, she questioned the need for 6,000sq. ft. of staff/admin. space at Leslieville when there is the same amount at Condor. Currently both groups train together on a weekly basis at Condor. Furthermore, there has NEVER been any information forth-coming from a supposed “interested training facility stakeholder” and absolutely no figures on potential rental income from outside usage. Finally the need for a 5 bay facility vs. a 3 bay one was questioned and Mr. Erik Hanson, Director of Public Works Infrastructure, admitted there was no need for additional storage space at this time.
Significant discussion took place on the matter and two motions were made:
1. Moved by Councillor Laing that Council direct Administration to re-design the fire hall proposed for the hamlet of Leslieville to be located on the newly purchased 27.43 acres and that this building with the land and site development not exceed $2.2M. (Note: The original 2018 budget was for $2.1M and the current one is for $5.1M). Motion defeated 5/2
2. Moved by Councillor Duncan that Council direct Administration to proceed with Plan 2 which includes gathering Requests for Proposals (RFP’s) for either a 3 or 5 bay facility , along with grading for Phase 1 and 2, including the appropriate drainage and access road. (Note: Phase 1 includes the building of the fire hall and the ground work for levelling, grading, etc. for that area. Phase 2 includes the proposed training area.) Motion passed 5/2
While it would seem that the decision has been made, there is still time for public input. It will take approximately 3 weeks to get the RFP’s and another 2 weeks to evaluate them and report back to council. Council will then evaluate the information they are given and make a final motion on the scope of the Leslieville Fire Hall. The CCTA is in the process of formulating a letter to be sent to council, asking that the letter be put on the April 14th agenda. The letter will be requesting Council to delay any decision on the facility until the proposed build can be accurately assessed in light of current economic conditions. We also encourage people to call their councillor and express any concerns they may have.
RANT It has been a long time since earlier, frequent, “rants” were included in the monthly newsletter. After the election in 2017, it seemed we had a fiscally responsible council, eager to accommodate the wishes of the people. Unfortunately, it seems that now the tables may have turned.
First of all there seems to be a real divide on Council: the experienced vs. the rookies. During the discussion re the Leslieville fire hall at the March 24th meeting the experienced focussed on financials such as:
· Overall unnecessary size and cost.
· Lack of business plan/numbers for the proposed training facility
· Questionable need for a training facility at all at Leslieville when land and facilities are available at Condor.
· Questionable need for extra bays/storage space.
· The commitment/dedication of volunteers has nothing to do with the size of the fire hall.
The newer councilors and CFRS staff focused more on passions with the following comments:
· Desire to make the facility more efficient as these Paid on Call volunteers are somebody’s family member and we want to make it easier for them. As such it would be better to keep the training props all in one area. (Note: There is room for that at Condor.)
· Concern that a smaller facility won’t adequately serve our fire fighters. That is not the way we support our people.
· A smaller facility undermines the level of service.
· A smaller facility might be perceived as punitive.
· There is a need to plan for the future and to build community. (Note: The population of Clearwater County has been steadily declining since 2014. The most important consideration in attracting people to an area is price of the property and being central to amenities such as schools and stores.)
I have received numerous phone calls and emails re the unnecessary need for this large a facility in Leslieville and the seemingly irresponsible financial actions of the majority of Council, ESPECIALLY IN THESE ECONOMICALLY CHALLENGING TIMES. The following are some of the comments received:
· Who is not doing adequate research and calculations to reveal actual costs? (re. training)
· Plans to go ahead are absolutely ludicrous in this current economic situation.
· This should be tabled until we see a light at the end of the tunnel.
· What would the comparative extra cost of operating/utility cost be for a larger facility?
· If they’re so passionate about helping people, why are they proposing to inflict extra costs on the taxpayer?
· We’re being run by a ship of fools and they’re determined to sink us, especially when we hit the iceberg of desperation and we join the Titanic.
· There are too many unknowns and unanswered questions. What is going to be the contribution to land/grading by Wild Rose School Division, and the phantom 3rd party potentially involved with the training facility?
· Ultimately, it comes down to common sense vs. a questionable subjective focus; fiscal responsibility vs. unnecessary over-spending; consideration of the greater good of ALL taxpayers vs. personal glory.
Up-coming Events: APRIL MEETING CANCELLED. Potential Meeting Monday, May 11, 2020, 7:30PM
Leslieville Fire Hall
At the March 24th Council meeting Marianne Cole, on behalf of the CCTA, made a presentation to council. She reinforced the need for fiscal restraint, noting there is no need for another large facility 11 km. away from Condor. As well, she questioned the need for 6,000sq. ft. of staff/admin. space at Leslieville when there is the same amount at Condor. Currently both groups train together on a weekly basis at Condor. Furthermore, there has NEVER been any information forth-coming from a supposed “interested training facility stakeholder” and absolutely no figures on potential rental income from outside usage. Finally the need for a 5 bay facility vs. a 3 bay one was questioned and Mr. Erik Hanson, Director of Public Works Infrastructure, admitted there was no need for additional storage space at this time.
Significant discussion took place on the matter and two motions were made:
1. Moved by Councillor Laing that Council direct Administration to re-design the fire hall proposed for the hamlet of Leslieville to be located on the newly purchased 27.43 acres and that this building with the land and site development not exceed $2.2M. (Note: The original 2018 budget was for $2.1M and the current one is for $5.1M). Motion defeated 5/2
2. Moved by Councillor Duncan that Council direct Administration to proceed with Plan 2 which includes gathering Requests for Proposals (RFP’s) for either a 3 or 5 bay facility , along with grading for Phase 1 and 2, including the appropriate drainage and access road. (Note: Phase 1 includes the building of the fire hall and the ground work for levelling, grading, etc. for that area. Phase 2 includes the proposed training area.) Motion passed 5/2
While it would seem that the decision has been made, there is still time for public input. It will take approximately 3 weeks to get the RFP’s and another 2 weeks to evaluate them and report back to council. Council will then evaluate the information they are given and make a final motion on the scope of the Leslieville Fire Hall. The CCTA is in the process of formulating a letter to be sent to council, asking that the letter be put on the April 14th agenda. The letter will be requesting Council to delay any decision on the facility until the proposed build can be accurately assessed in light of current economic conditions. We also encourage people to call their councillor and express any concerns they may have.
RANT It has been a long time since earlier, frequent, “rants” were included in the monthly newsletter. After the election in 2017, it seemed we had a fiscally responsible council, eager to accommodate the wishes of the people. Unfortunately, it seems that now the tables may have turned.
First of all there seems to be a real divide on Council: the experienced vs. the rookies. During the discussion re the Leslieville fire hall at the March 24th meeting the experienced focussed on financials such as:
· Overall unnecessary size and cost.
· Lack of business plan/numbers for the proposed training facility
· Questionable need for a training facility at all at Leslieville when land and facilities are available at Condor.
· Questionable need for extra bays/storage space.
· The commitment/dedication of volunteers has nothing to do with the size of the fire hall.
The newer councilors and CFRS staff focused more on passions with the following comments:
· Desire to make the facility more efficient as these Paid on Call volunteers are somebody’s family member and we want to make it easier for them. As such it would be better to keep the training props all in one area. (Note: There is room for that at Condor.)
· Concern that a smaller facility won’t adequately serve our fire fighters. That is not the way we support our people.
· A smaller facility undermines the level of service.
· A smaller facility might be perceived as punitive.
· There is a need to plan for the future and to build community. (Note: The population of Clearwater County has been steadily declining since 2014. The most important consideration in attracting people to an area is price of the property and being central to amenities such as schools and stores.)
I have received numerous phone calls and emails re the unnecessary need for this large a facility in Leslieville and the seemingly irresponsible financial actions of the majority of Council, ESPECIALLY IN THESE ECONOMICALLY CHALLENGING TIMES. The following are some of the comments received:
· Who is not doing adequate research and calculations to reveal actual costs? (re. training)
· Plans to go ahead are absolutely ludicrous in this current economic situation.
· This should be tabled until we see a light at the end of the tunnel.
· What would the comparative extra cost of operating/utility cost be for a larger facility?
· If they’re so passionate about helping people, why are they proposing to inflict extra costs on the taxpayer?
· We’re being run by a ship of fools and they’re determined to sink us, especially when we hit the iceberg of desperation and we join the Titanic.
· There are too many unknowns and unanswered questions. What is going to be the contribution to land/grading by Wild Rose School Division, and the phantom 3rd party potentially involved with the training facility?
· Ultimately, it comes down to common sense vs. a questionable subjective focus; fiscal responsibility vs. unnecessary over-spending; consideration of the greater good of ALL taxpayers vs. personal glory.
May fiscal responsibility take precedence over unfounded wishes.
Up-coming Events: APRIL MEETING CANCELLED. Potential Meeting Monday, May 11, 2020, 7:30PM
Friday, March 27, 2020
BURNING ISSUES RE PROPOSED LESLIEVILLE FIRE HALL
By Marianne Cole
On Tuesday, March 24, 2020, Marianne Cole, on behalf of the Clearwater County Taxpayers’ Association, made a presentation to Clearwater County Council on the proposed plans for the new fire hall at Leslieville.
Originally this current council passed a motion in August of 2018 to build a 10,000 sq. ft., 5 bay facility at Condor for $4M; and an 8,950 sq. ft., 3 bay facility in Leslieville for $2.1M.
Condor’s facility was completed in 2019. It sits on 8 acres of land and includes 10,000sq. ft. storage space (3 apparatus bays and 2 public works/ag.service bays) and 6,000 sq. ft. admin./staff space.
Recent plans have seen a drastic change in the plans for Leslieville and a dramatic increase in costs:
1. Purchase of 27.43 acres of land for $365,000, to be allocated as follows:
a. fire hall building site, parking area and fire pond = 7.25 acres;
b. future training area, including fire training tower = 12 acres;
c. future parks and sports field = 8.18 acres.
2. Site design/construction = $1, 056,000
3. Building = $3, 529, 000 (5 bay) and $3, 160,000 (3 bay)
4. Equipment = $170,000
5. TOTAL COST = $5, 120,000 (2.6 times greater than the original budget and $1, 317,000 more than Condor) Note: Not included in that figure is $500,000 for the training facility in 2021.
SERIOUS CONCERNS
Justification of need for another large facility when a smaller one would suffice.
The need for two facilities in such close proximity---11km. apart. Other areas of the county are much farther away from ANY fire hall.
The need for a training facility when there is one in Red Deer that local fire fighters can access at a cost of $4800/yr. No need to spend $500,000 on a facility here.
The complete lack of figures/business plan related to the training facility.
The need for another 6,000 sq. ft. of staff/admin space in Leslieville when there is that much in Condor.
THE MOST CRUCIAL NEED TO BE FISCALLY RESPONSIBLE IN THIS CURRENT ECONOMIC SITUATION. The County is currently owed $6M in tax arrears for 2019.
Significant discussion by council followed the presentation and it was clearly evident that there was a divide on council--- the experienced vs. the rookies. The experienced councillors (Duncan, Vandermeer and Laing), most notably Vandermeer, expressed distinct concern for the definite need for figures related to the training facility along with the questionable need for over-spending on a large facility. The newer councillors (Laird, Lougheed, Hoven, and Swanson), along with county staff, focussed more on the emotional passions of ensuring support for our volunteers who willingly give of their time.
In the end, two motions were made:
1. Moved by Councillor Laing that council direct administration to re-design the fire hall for the hamlet of Leslieville, to be located on the newly purchased 27.43 acres of land and that this building with the land and site development not exceed $2.2M. DEFEATED 5/2
2. Moved by Councillor Laird that council advise administration to proceed with Plan 2 which includes tender grading plan for Phase 1 and advertising for an RFP for the Leslieville Public Services Building as described including a 3 or 5 bay option. PASSED 5/2
The timeline for the gathering of information and making of a final decision is about 5 weeks--- 3 weeks for advertising/receipt of RFP’s and 2 weeks for their evaluation and bringing the results back to council for approval.
Currently the CCTA is discussing further plans and options to encourage citizen engagement that would ensure council makes the most financially responsible decision, reflective of resident wishes. We would love to hear your comments and concerns. You may reply to this website or send an email to mcmajic@telus.net.
On Tuesday, March 24, 2020, Marianne Cole, on behalf of the Clearwater County Taxpayers’ Association, made a presentation to Clearwater County Council on the proposed plans for the new fire hall at Leslieville.
Originally this current council passed a motion in August of 2018 to build a 10,000 sq. ft., 5 bay facility at Condor for $4M; and an 8,950 sq. ft., 3 bay facility in Leslieville for $2.1M.
Condor’s facility was completed in 2019. It sits on 8 acres of land and includes 10,000sq. ft. storage space (3 apparatus bays and 2 public works/ag.service bays) and 6,000 sq. ft. admin./staff space.
Recent plans have seen a drastic change in the plans for Leslieville and a dramatic increase in costs:
1. Purchase of 27.43 acres of land for $365,000, to be allocated as follows:
a. fire hall building site, parking area and fire pond = 7.25 acres;
b. future training area, including fire training tower = 12 acres;
c. future parks and sports field = 8.18 acres.
2. Site design/construction = $1, 056,000
3. Building = $3, 529, 000 (5 bay) and $3, 160,000 (3 bay)
4. Equipment = $170,000
5. TOTAL COST = $5, 120,000 (2.6 times greater than the original budget and $1, 317,000 more than Condor) Note: Not included in that figure is $500,000 for the training facility in 2021.
SERIOUS CONCERNS
Justification of need for another large facility when a smaller one would suffice.
The need for two facilities in such close proximity---11km. apart. Other areas of the county are much farther away from ANY fire hall.
The need for a training facility when there is one in Red Deer that local fire fighters can access at a cost of $4800/yr. No need to spend $500,000 on a facility here.
The complete lack of figures/business plan related to the training facility.
The need for another 6,000 sq. ft. of staff/admin space in Leslieville when there is that much in Condor.
THE MOST CRUCIAL NEED TO BE FISCALLY RESPONSIBLE IN THIS CURRENT ECONOMIC SITUATION. The County is currently owed $6M in tax arrears for 2019.
Significant discussion by council followed the presentation and it was clearly evident that there was a divide on council--- the experienced vs. the rookies. The experienced councillors (Duncan, Vandermeer and Laing), most notably Vandermeer, expressed distinct concern for the definite need for figures related to the training facility along with the questionable need for over-spending on a large facility. The newer councillors (Laird, Lougheed, Hoven, and Swanson), along with county staff, focussed more on the emotional passions of ensuring support for our volunteers who willingly give of their time.
In the end, two motions were made:
1. Moved by Councillor Laing that council direct administration to re-design the fire hall for the hamlet of Leslieville, to be located on the newly purchased 27.43 acres of land and that this building with the land and site development not exceed $2.2M. DEFEATED 5/2
2. Moved by Councillor Laird that council advise administration to proceed with Plan 2 which includes tender grading plan for Phase 1 and advertising for an RFP for the Leslieville Public Services Building as described including a 3 or 5 bay option. PASSED 5/2
The timeline for the gathering of information and making of a final decision is about 5 weeks--- 3 weeks for advertising/receipt of RFP’s and 2 weeks for their evaluation and bringing the results back to council for approval.
Currently the CCTA is discussing further plans and options to encourage citizen engagement that would ensure council makes the most financially responsible decision, reflective of resident wishes. We would love to hear your comments and concerns. You may reply to this website or send an email to mcmajic@telus.net.
IT IS ALL OF OUR TAX DOLLARS AT STAKE
Saturday, March 7, 2020
Sunday, March 1, 2020
IN THE NEWS
Leslieville Fire Hall
Concerns continue to be expressed over the plans and lack of information being provided to the taxpayers on the scope of this project.
At the February 9th CCTA meeting there was significant discussion on the matter and we were very happy to have 6 councillors in attendance to not only hear taxpayer concerns but also to share what information they could.
It was suggested that we organize a meeting so that information and concerns could be more widely addressed. Reeve Tim Hoven suggested that the county could host such an event and we graciously thanked him for the offer.
When the notice appeared in the February 19th Western Star for an “Open House” at the Leslieville Fire Hall we were distinctly disappointed with the format for the following reasons:
At an Open House people come and go so not everyone is present at the same time to hear the information offered or the questions asked/responses given.
Furthermore, people can talk to/question different “presenters” and get different, potentially conflicting information.
If the intent of hosting the event at the fire hall was to allow people to see the “state” of the facility, the equipment should be in there for an accurate picture of the crowded size, and then where would there be room for people to gather or information to be presented?
Having the most important part of the evening, the “presentation” at 6:00PM is definitely an inconvenient time. People are just arriving home from work and/or having supper. Also, wouldn’t it be more beneficial to see the fire hall before the presentation??
Finally, the last concern was over inadequate parking.
These concerns/frustrations were immediately voiced with members of council and administration. We were subsequently informed that the format would be changed. There would be a tour of the fire hall first, followed by a meeting at the Elk’s Hall. Consequently, we put together a page of information to be published in the February 26th edition of the Western Star so people could have some background information before the meeting. In the interest of transparency, and so those involved in hosting the event could have more prep time, a copy of this information was emailed to both council and administration on Friday, February 21.
Ads then appeared in both The Mountaineer and Western Star advertising an “Open House” on March 5th with a “Presentation” at 6:00PM at the Elks’ Hall followed by a “Tour” of the fire hall at 7:00PM. This is a complete reversal of the information we received regarding the format and we definitely question its effectiveness with only a 1 hour presentation and the tour to follow. Our most sincere hope is that the “presentation” might allow for more time for citizen engagement/questions to adequately occur.
Partnerships
Words have been floating around about County partnerships with Wild Rose School Division and an “unnamed” private company for “opportunities” on the newly purchased land/proposed Fire Hall. Unfortunately no concrete information has been available to date.
With the extensive amount of land purchased (27+ acres), it seems possible that the partnership with WRSD might involve future consideration for recreation fields (ball diamonds, track, soccer pitch, etc.). Such a partnership is certainly commendable.
The other option, a partnership with a “private company” for a potential fire fighter training facility leads to more questions. Who is the company? Why have they not come forward with their vision? What is the need?
Currently there is a quality training facility in Red Deer which our volunteer fire fighters access about 3 times per year. There is a rental fee for its use and attempts have been made to gather information on that cost but it was unavailable at time of printing. Hopefully we will have it for sharing at the March 5th meeting.
In the meantime, questions abound on the necessity/viability of such a facility with very limited use. Comments have been made that we could rent it out to other fire fighter groups but, with a centrally located option at Red Deer, who would travel out to Leslieville?? If this private facility become non-viable, who would be responsible/accept the future operating costs???
A LOT OF UNANSWERED QUESTIONS REMAIN. WE ENCOURAGE EVERYONE TO ATTEND THE MEETING AT THE ELKS’ HALL AT 6:00PM ON MARCH 5TH.
Smiles for March:
Why do leprechauns love to garden? They have green thumbs.
Why shouldn’t you borrow money from a leprechaun? They are always a little short.
Coming Events:
Clearwater Rural Crime Annual Meeting, Monday, March 2, 2020, 7:00PM Leslieville Community Hall
Clearwater County Information Open House re Fire Hall, Thursday, March 5, 2020, 6:00PM, Leslieville Elks’ Hall
Clearwater County Taxpayers’ Association regular monthly meeting, Monday, March 9, 2020, 7:30PM, Arbutus Community Hall
Friday, February 14, 2020
Email To Clearwater County Council
Hi all,
The link below is to the Strategic Planning Session on January 20 with
video in regards to the proposed RFP for a new Leslievile fire hall: https://clearwatercounty.civicweb.net/document/8628?splitscreen=true&media=true
I would suggest that you watch it because it reveals the power of the
new technology that you have introduced into council chambers.
Your body language can be examined in detail by any observer.
So, now you are like athletes on the world stage 🙂
Anyway, if you reflect on this footage, I think it is pretty obvious
that things have moved sideways with two fire halls proposed with a
price tag of some $10 million
virtually side by side serving about one third of the county population.
Need I say more?
Regards,
Helge
Sunday, February 2, 2020
IN THE NEWS
Leslieville Fire Hall
According to the January 14, 2020 County Council Meeting Minutes Council passed a motion to purchase 27.43 acres of land for $350,000. This property is located on the south side of the “Withrow Road” running east from Leslieville and is adjacent to the east side of the current Leslieville School. While plans are not yet finalized for the complete use of this property, indications are that the new Leslieville Fire Hall will be located there. According to the budget Council approved in December, $5,120,000 has been allocated from the 2020 capital budget and $500,000 from the 2021 budget for this new facility.
Municipal Development Plan Review
Also at their January 14th meeting, Council approved the terms of reference for the up-coming Municipal Development Plan review. The Municipal Development Plan is the document that governs land development in the county including residential subdivisions, industrial development, and all accompanying land uses. The current MDP was adopted in 2010. Information about the process and how county residents can be involved will be on the county’s website as well as on Facebook. It is also hoped that current information will be regularly publicized in the local papers so that our more senior residents will have easy access to relevant happenings with this important process. It is crucial that there be equal opportunity for input by all. As the process progresses, plans are to hold open house meetings in Nordegg, Rocky Mountain House, Leslieville, and Caroline. We encourage everyone to become involved, as the decisions that are made will determine how our land is used/protected as well as what our community will look like in the years to come.
2019 County Financial Contributions
With special thanks to the Administration in the county office, most specifically Murray Hagan, we have received information on the amount of money the County contributed to the town of Rocky, the village of Caroline, and Regional Services for the 2019 year.
|
Category |
To
the Town of Rocky |
To
Village of Caroline |
To
Regional Services |
|
Recreation |
$824,
400 |
$421,
648 |
|
|
Culture
(Library)
|
$170,
000 |
$
25, 000 |
|
|
Culture
(Museum) |
$
30, 000 |
$
12, 000 |
|
|
Fire
(HQ) |
$400,
597 |
||
|
Fire
Stations
|
$1,
447, 988 |
||
|
Police
(Admin)(RCMP) |
$205,
000 |
||
|
Police
(SRO)**
|
$135,
200 |
||
|
Police
(Victim Services)
|
$
10, 000 |
||
|
Solid
Waste |
$2,
119, 873 |
||
|
FCSS
|
$
88, 550 |
||
|
Health
(recruitment) |
$
12, 000 |
||
|
Health
(clinic) |
$10,
000 |
||
|
Seniors
Funding
|
$4,
500 |
$1,
060, 598 |
|
|
Airport |
$26,
500 |
||
|
Volunteer
Recognition |
$2,
500 |
||
|
Revenue
Sharing
|
$750,
000 |
$50,
000 |
|
|
TOTAL
|
$2,
163, 000 |
$527,
373 |
$5,
117, 606 |
|
|
|
|
|
**SRO is the RCMP School Resource Officer
THE GRAND TOTAL OF COUNTY TO COMMUNITY CONTRIBUTION (“3C FUNDING”) IS $7, 808, 079. County taxpayers are certainly contributing substantially to the well-being of our whole community.
Smiles for February:
1. Why do skunks love Valentine’s Day? Because they’re scent-imental creatures.
2. What did the toast say to the butter on Valentine’s Day? You’re my butter half.
3. What did the rabbit say to his girlfriend on Valentine’s Day? Some bunny loves you.
Coming Events
Note: All regular meetings will now be held the second Monday of each month.
February 10, 2020, 7:30PM, Arbutus Hall, Regular Meeting
March 9, 2020, 7:30PM, Arbutus Hall, Regular Meeting
Also please make a change to our Board members: Please drop Sharon Rubeling and add Jim Pearson. Thanks a bunchJJ
Subscribe to:
Posts (Atom)